| PSB | PS | |||||||
|---|---|---|---|---|---|---|---|---|
| USER | HARMONIC | RINGS | INTENSITY (x1010p/Ring) | USER | BP Nbr | HARMONIC | INTENSITY (x1010p) | COMMENTS |
| AD Y.Riva | H1 | 1,2,3,4 | 400 | AD O.Hans | 2 | Hswp | 1600 | Low spaced bunch for Antiproton production for AD |
| CNGS F.Chapuis | H2 | 1,2,3,4 | 750 | CNGS G.Adrian | 1 | H8-H420 | 3000 | Protons for SPS CNGS operation using (CT extraction) |
| EASTA D.Allen | H1 | 3 | 30 | EASTA F.Peters | 2 | H8 | 30 | Slow extraction to East Area North branch (T9, T10, T11) |
| EASTB D.Allen | H1 | 1,2,3,4 | 10 | EASTB F.Peters | 2 | H16 | 20 | Slow ejection to East Area South branch (T8, DIRAC) |
| EASTC D.Allen | H1 | 3 | 30 | EASTC F.Peters | 2 | H8 | 30 | Slow extraction to East Area south branch (T7 irradiations, T7 secondary) |
| SFTPRO | H2 | 1,2,3,4 | max. 600 | SFTPRO H.Genoud | 1 | H8→H16→H420 | 2400 | Protons for SPS fixed target (CT extraction) |
| TOF | H1 | 2 | 700 | n-TOF | 1 | H8 | 700 (→ 850) | F16 Fast Extraction |
| PSB | PS | |||||||
|---|---|---|---|---|---|---|---|---|
| USER | HARMONIC | RINGS | INTENSITY (x1010p/ring) | USER | BP Nbr | HARMONIC | INTENSITY (x1010p) | COMMENTS |
| LHC25A&B | H1 | 4R+2R | 160 | LHC25 D.Cotte | 3 | H7 / H84 | 940 | LHC 25ns bunch spacing, 12 to 72 bunches |
| LHC50 | H2 | 3R | 165 | LHC50 D.Cotte | 2 | H7 / H84 | 470 | LHC 50ns bunch spacing, 12 to 36 bunches |
| LHCINDIV | H1 | 1 up to 4 | 2 → 12 | LHCINDIV P.Freyermuth | 2 | H16 / H84 | 2 → 48 | LHC individual physics beam, 1 to 4 bunches (no splitting) |
| LHCPILOT | H1 | 3 | 0.5 | LHCPILOT P.Freyermuth | 2 | H16 / H84 | 0.5 | |
| LHCPROBE | H1 | 3 | 0.5 → 2 | LHCPROBE P.Freyermuth | 2 | H16 / H84 | 0.2 → 2 | LHC probe beam for commissioning ((εh,v at PSB extraction (1σ) 1πµm) |
| LHC25 | H1 | 4R | TSTLHC25 D.Cotte | 2 | H7 / H84 | LHC 25 ns bunch spacing, 48 bunches | ||
| LHC75 | H2 | 3R | 110 for LHC75 80 for LHC150 | LHC75 D.Cotte | 2 | H7 / H84 | 350 | LHC 75ns bunch spacing, 8 to 24 bunches LHC 150ns bunch spacing, 4 to 12 bunches |
| LEIR | PS | |||||||
| EARLY | …. | …. | … | LHCION | 2 | H16 / H169 | 1,10→5×108n | Early Ion beam for LHC commissioning, 1 bunch (no splitting) |
| USER | HARMONIC | RINGS | TOTAL INTENSITY (x1010p) | COMMENTS |
|---|---|---|---|---|
| NORMGPS | H1 | 1,2,3 & 4 | 3000 | Isolde GPS Target |
| NORMHRS | H1 | 1,2,3 & 4 | 3000 | Isolde HRS Target |
| STAGISO | H1 | 2,3, & 4 | 1000 | HRS & GPS Target |
| NORMHRS | H1 | 1,2,3 & 4 | 3000 | 1GeV Isolde HRS Target |
| PSB | PS | |||
|---|---|---|---|---|
| USER | COMMENTS | USER | COMMENTS | DATE |
| MD1 | PS MTE h2 beam (SFTPRO version) | MD1 H.Genoud | Machine development (new MTE, Nominal Beam) | March 2010 |
| MD2 F.Chapuis | PS MTE h2 beam (CNGS version) | MD2 H.Genoud | Machine development (new MTE, Setting-Up Beam) | March 2010 |
| MD3 | Beam for SPS impedance measurements | MD3 | Machine development | |
| MD4 | MD version of LHCINDIV for SPS (Optics, Impedances, Abort cleaning gap tests | |||
| MDION | Cycle reserved for LINAC2 | MDION D.Cotte | nominal ion beam | |
| MDPSB | Flat 160 MeV magnetic cycle for space charge studies; in 2008 VELO high-rate tests | MDPS | Space charge studies, in 2007 MERIT beam | |
| MDPRO | Free for OP team | |||
| TSTPS | User for PS tests | TSTPS | Tests for PS (working point user) | |
| PSB | PS | |||||||
|---|---|---|---|---|---|---|---|---|
| USER | HARMONIC | RINGS | INTENSITY | USER | BP Nbr | HARMONIC | INTENSITY | COMMENTS |
| ZERO J.M Nonglaton | H1 | …. | 0 | ZERO J.M Nonglaton | 1 | H8 | 0 | No beam and flat magnetic cycle |